PROJECTS CURRENTLY BIDDING

Fax Quote to Pro Construction, Inc.

Fax:  (910) 455-6174 or

Email: probid@proconstructinc.com

For Questions Call our Estimating Department

Phone: (910) 455-0647

PRO Construction, Inc. encourages all women-owned, small disadvantaged, HUBZone, veteran-owned and service disabled veteran-owned small businesses to provide quotations for all jobs that we are bidding.

PRO Construction, Inc. is an equal opportunity employer.

maxview                           Get Adobe Reader logo

PROJECT NAME

BID DATE & TIME
Unless otherwise stated:
Time Due to
PRO Shown is
1 HOUR Prior to
Official Bid Time

ESTIMATOR
For Internet Questions / Problems Please Contact June.

ELECTRONIC FILES

AMENDMENTS

Specification Guide for all North Carolina MACC projects
Project No.

Repair First Battalion Barracks, Building 591, MCRD Parris Island, SC

Thurs., Sept. 2, 2010
Changed by Amend 1

2:00 PM

Tim Barrett
   
 

www.militaryandfederal.com

 
 

Time of Completion 555 Days

   
   
   
   
   
Project No.

ACP-LITE Infrastructure, Clay National Guard Center, Marietta, GA

GA National Guard MATOC

Thurs., Sept. 2, 2010

2:00 PM

Scot Thompson
   
Specifications
Drawings
 
 

Time of Completion 45 Days

Amend 1  
Amend 2  
   
   
   
Project No. 10-0050

Construct Paved Parking, Vicinity of FC332, MCB Camp Lejeune, NC

NC Paving MACC

Fri., Sept. 3, 2010

10:00 AM

Shawn Brown
910-353-3797
Specifications
Drawings
Reference Drawings
 
 

Time of Completion 90 Days

   
   
   
   
Project No. 13100078

Renovation & Upgrade Bldg #403, CNGC, Marietta, GA

GA National Guard MATOC

Wed., Sept. 8, 2010

1:00 PM

Bob Warden
   
Specifications

Scope of Work

Floor Plan
 

Time of Completion 60 Days

Amend 1  
Amend 2  
   
   
   
Project No. 4936342

Pavement Repairs, Crossland Drive, MCAS Cherry Point, NC

NC Paving MACC

Wed., Sept. 8, 2010

1:00 PM

Shawn Brown
910-353-3797
Specifications
   
   
 
 

Time of Completion 45 Days

   
   
   
   
Solicitation #10-0248

Child Development Center, Courthouse Bay, MCB Camp Lejeune (ARRA project)

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
1:00 PM
Wed., Sept. 8, 2010

 

Scot Thompson
 
 
 

www.militaryandfederal.com

 
 
 
Time of Completion 480 Days
   
   
   
   
   
   
   
   
Project No. 5579172

Perform a Complete Inspection of the Sprinkler and Foam Systems in Buildings 398, 1665, and 1667, MCAS Cherry Point, NC

Wed., Sept. 8, 2010

1:00 PM

Bob Warden
   
 

www.militaryandfederal.com

 
 

Time of Completion 90 Days

   
   
   
   
   
Project No. 10-0099


ANAM Addition, Bldg 326, MCB Camp Lejeune, NC

 

Changed by Amend 1
Thurs., Sept. 9, 2010

1:00 PM

Ryan Weaver
   
 

www.militaryandfederal.com

 
 

Time of Completion 270 Days

   
   
   
   
   
Project No. 10-0216

Athletic Field Improvements, DDESS, MCB Camp Lejeune, NC

NC Paving MACC

Thurs., Sept. 9, 2010

1:00 PM

Tim Barrett
Specifications
Bid Form
Drawings
 
 

Time of Completion 273 Days

Amend 1
   
   
   
   
Project No.

Renovation & Upgrade to Bldg, 403, Clay National Guard Center, Marietta, GA

GA National Guard MATOC

Thurs., Sept. 9, 2010

3:00 PM

Bob Warden
   
Specifications
Scope of Work
Floor Plan
 

Time of Completion 460 Days

Amend 1  
Amend 2  
   
   
   
Solicitation #P11051R & P11052R

Provide / Install New Solar Thermal Water Heating System, Bldg 591, 601, 589, & 599, MCRD Parris Island

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
3:00 PM
Thurs., Sept. 9, 2010

 

Tim Barrett
 
 
 

www.militaryandfederal.com

 
 
 
Time of Completion 315 Days
   
   
   
   
   
   
   
   
Project No. BE0915M

Renovate/Repair Hangar 418, MCAS Beaufort, SC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
3:00
Tues., Sept. 9, 2010

 

Ryan Weaver
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 195 Days
 
   
   
   
   
   
   
   
   
Project No.P1080R

Construct New Female Shower Facility and Page Field, MCRD Parris Island, SC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
3:00
Tues., Sept. 10, 2010
Changed By Amend 2

 

Scot Thompson
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 315 Days
 
   
   
   
   
   
   
   
   
Project No.

Install New Water Mains at Tank & Brig Roads and at Third Street and Lockwood Court NWS Charleston, SC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
10:00 AM
Fri., Sept. 10, 2010

 

Bob Warden
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 135 Days
 
   
   
   
   
   
   
   
   
Project No.4927611 CP1017R

Pave Perimeter Road, MCAS Cherry Point, NC

NC Paving MACC

Mon., Sept. 13, 2010

1:00 PM

Shawn Brown
910-353-3797
Scope of Work
Specifications
Drawings 1 of 6
Drawings 2 of 6
Drawings 3 of 6
Drawings 4 of 6
Drawings 5 of 6
Drawings 6 of 6
 

Time of Completion 360 Days

Amend 1
   
   
   
   
Project No.4927611 CP1017R

Pave Radar Road, MCAS Cherry Point, NC

NC Paving MACC

Mon., Sept. 13, 2010

1:00 PM

Shawn Brown
910-353-3797
 
Specifications
 
Drawings G1 - C10
Drawings C11 - C24
 
 
 
 

Time of Completion 360 Days

   
   
   
   
Project No.5537447 & 5587750

Make Repairs to Parking Lot B87 & Install Sidewalks, B4832, T4829 and 4213, MCAS Cherry Point, NC

NC Paving MACC

Mon., Sept. 13, 2010

1:00 PM

Shawn Brown
910-353-3797
Scope of Work
 
 
 
 

Time of Completion 120 Days

   
   
   
   
Project No.

Repairs to Short Stay Seawall Moncks Corner, SC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
9:00 AM
Tues., Sept. 14, 2010

 

Tim Barrett
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 90 Days
 
   
   
   
   
   
   
   
   
Project No.BE0705RS/M

Renovation/Repairs to Bldg 807, MCAS Beaufort, SC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
3:00 PM
Tues., Sept. 14, 2010

 

Bob Warden
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 380 Days
 
   
   
   
   
   
   
   
   
Project No. P1107M

Repair Steam System Components, MCRD, Parris Island, SC

 


3:00 PM
Tues., Sept. 14, 2010

 

Tim Barrett
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 435 Days
 
   
   
   
   
   
   
   
   
Project No.

Remodeling of Communications Section of Bldg 2079, Clay National Guard Base, Robins AFB, GA

 


3:00 PM
Mon., Sept. 15, 2010

 

Bob Warden
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 90 Days
 
   
   
   
   
   
   
   
   
Project No.

Remove/Replace Loose Floor Tiles  and Reconfigure Fencing and Pavement for Bldg 2312, Clay National Guard Base, Robins AFB, GA

 


3:00 PM
Mon., Sept. 15, 2010

 

Scot Thompson
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 45 Days
 
   
   
   
   
   
   
   
   
Project No. P1107M

Add Comm. Room and Move Conference Room, Paint Interior Walls of Warehouse, Bldg 2059, Clay National Guard Base, Robins AFB, GA

 


3:00 PM
Mon., Sept. 15, 2010

 

Tim Barrett
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 435 Days
 
   
   
   
   
   
   
   
   
Project No.

National Guard Tactical Unmanned Aerial System (TUAS) Support Facility at Fort Bragg, NC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
12:00 PM
Wed., Sept. 16, 2010

 

Scot Thompson
 
Specifications Vol. 1
Specifications Vol. 2

Drawings

 
 
Time of Completion 310 Days
 
   
   
   
   
   
   
   
   
Project No.CP0913M & CP0926R

Repair TEQ B-3673 & Improvements to TEQ B-3673, MCAS Cherry Point, NC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
1:00 PM
Thurs., Sept. 16, 2010

 

Ryan Weaver
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 540 Days
 
   
   
   
   
   
   
   
   
Project No.5159687

Expand Turning Radius 6th Ave and "C" Street, MCAS Cherry Point, NC

NC Paving MACC

Thurs., Sept. 16, 2010

1:00 PM

Shawn Brown
910-353-3797
Specifications
Drawings
 
 
 

Time of Completion 120 Days

   
   
   
   
Project No.5386790

Replace Marquee Signs, Various Locations, MCAS Cherry Point, NC

 


1:00 PM
Thurs., Sept. 16, 2010

 

 
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 180 Days
 
   
   
   
   
   
   
   
   
Project No.5334106

Replace HID Lighting in Hangars, B-250, MCAS Cherry Point, NC

 


1:00 PM
Thurs., Sept. 16, 2010

 

 
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 75 Days
 
   
   
   
   
   
   
   
   
Project No.

Modify Equipment Platform B-133, Purchase and Install Railing on Roof Edge of B4808, Purchase and Install Spiral Stairs B-133, MCAS Cherry Point, NC

 


1:00 PM
Thurs., Sept. 16, 2010

 

 
 
 
 

www.militaryandfederal.com

 
 
Time of Completion 180 Days
 
   
   
   
   
   
   
   
   
Project No. 4927622

Repair and Improve Bulkhead, Hancock Marina, MCAS Cherry Point, NC

NC Paving MACC

Fri., Sept. 17, 2010

1:00 PM

 
 
 
Drawings & Specifications will be posted soon.
 
 

Time of Completion ??? Days

   
   
   
   

Solicitation No. N40085-R-2047
Project NO. 09-0035

TT-22 Redesign Male and Female Locker Room, Tarawa Terrace, MCBCL, NC

8a MACC Seed Project

Fri., Oct. 1, 2010

1:30 PM

 
Solicitation
Seed Project Specifications
Seed Project Drawings
 
 

Time of Completion for Seed Project is 120 Days

   
   
   
   
PROJECTS BID - RESULTS NOT AVAILABLE AT THIS TIME
Project No: N40085-09-R-5308

Replace Windows RR4 MCB Camp Lejeune, NC, GCMACC Seed Project

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
1:00 PM
Tues., June 15, 2009

Scot Thompson  
Solicitation
   
Drawings
Subcontractor & Supplier quotations must be valid for
180 Days.
Amend 1 Amend 6
Amend 2  
Amend 3  
Amend 4  
Amend 5  
Solicitation No. W912HN-09-R-0018

Albritton Jr. High School Addition, Ft. Bragg, NC

GA MATOC Seed Project

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
3:00 PM
Mon., Mar. 22, 2010
 

Ryan Weaver
Specs Vol. 1 Generic MATOC
Specs Vol. 2 Seed Project
Specs Vol. 3 Seed Project
Drawings PDF Drawings CAL ZIP File
   
Subcontractor & Supplier Quotations must be valid for 120 Days.

Time of Completion 365 Days

Amend 1 Amend 4
Amend 2 Amend 5
Q & A 3-8-10 Amend 6
Amend 3  
Amend 3 Drawings  
Project No. W91236-10-R-0012

Construction of Infantry Platoon Battle Course (IPBC), Ft AP Hill, VA

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
11:00 AM
Wed., Apr. 14, 2010

Ryan Weaver  
Solicitation
Specifications
Drawings in PDF Format
CAL Drawings Zip File
 
Time of Completion 365 Days
Amend 1 Amend 5
Amend 2 Amend 6
Amend 3 Amend 6 Drawings
Amend 4  
Solicitation No. M00146-10-T-9016

Design/Build Plastic Media Blast Room Facility, MCAS Cherry Point, NC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
2:00 PM

Fri., May 14, 2010

Tim Barrett
Bob Warden
Solicitation
Site Visit Questions/Answers
Drawing
D/B Drawing
Subcontractor & Supplier Quotations must be valid for 90 Days.

Time of Completion 160 Days

Amend 1  
Amend 2  
Amend 2 Attach  
Amend 2 Drawing  
   
Project No. W912HN-10-R-0005
 

SOF Operations Support Additions, Ft Bragg, NC

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
2:00 PM
Thurs., May 20, 2010
As we must overnight our proposal to the owner.

Ryan Weaver  
Volume 1 Specifications
Volume 2 Specifications
Cal Drawings in Zip File
PDF Drawings
 
Time of Completion 540 Days
Amend 1 Review Docs
Amend 2 Amend 3
Reference Drawings Amend 4
Projnet Q & A
4-26-10
Amend 4 Drawings
SOW 0025 - Work Order 796570

Electrical Substation, MCRD Parris Island, SC (P360) - Design/Build

SC & GA MACC

Project Awarded to

TEAM Construction, LLC
8/31/10

Scot Thompson
 
D/B Specifications
RFP
CADD Drawing

Layer Table

D-B Drawings

Time of Completion 555 Days

Amend 1 Amend 3
Amend 1 Dwgs  
Amend 2  
Amend 2 CADD  
Q & A 5-25  
Project Number 5067808

2D MAW Sign, MCAS Cherry Point, NC

Project Awarded to:

Military & Federal Construction

Ryan Weaver
 

www.militaryandfederal.com

THIS IS A DESIGN/BUILD MACC PROJECT

Time of Completion 180 Days

   
   
   
   
   
Project Number 4798230

Forklift Travel Path, MCAS Cherry Point, NC

Paving MACC

Thurs., July 1, 2010

1:00 PM
 

Ryan Weaver
 

Specifications

Drawings
 
 

Time of Completion 120 Days

Amend 1  
   
   
   
   
Project #4798199

Construct Office, Commander's Suite, B-159, MCASCP NC

Thurs., July 15, 2010 

1:00 PM
Tim Barrett
 
 
 

www.militaryandfederal.com

 
   

Time of Completion 60 Days

   
   
   
   
   
Project Number 4137147 & 4137149

Repairs to Building 1669, MCAS Cherry Point, NC

Thurs., July 1, 2010

1:00 PM

Tim Barrett
 

www.militaryandfederal.com

 

Time of Completion 470 Days

   
   
   
   
   
Project Number 4972213

Replace Sidewalks and Patch Asphalt Parking Lot Bldg. 232, MCASCP, NC

Paving MACC

Wed., July 21, 2010

1:00 PM
 

 
Scope of Work
 
Davis Bacon Wage Rates
 
Time of Completion 60 Days

 

Revised Drawings  
   
   
   
   

Motor Transport Facility, MCRD Parris Island, SC (P-366)

SC & GA MACC

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
1:30 PM
Tues., July 27, 2010

Ryan Weaver
Div 1 Div 2 -33
Drawings
CADD Drawings
General Civil
Architectural Structural
Plumbing Mechanical
Electrical Fire Protection
Reports
Geo Tech Derived Waste
Asbestos-Lead Geothermol
Test Wells
US EPA Groundwater Tests

Time of Completion 380 Days

Amend 0001  
Drawing E-101  
Amend 0002  
   
   
 
   
Project #10-0024

Parking Lot Addition, Bldg. H-14, MCBCL, NC

Paving MACC

Tues., July 27, 2010

1:00 PM
Shawn Brown
910-353-3797
 
Specifications
Drawings
 
This is a FY10 Straddle project.  Proposals will not expire for 180 days after receipt of proposals.
   

Time of Completion 60 Days

Amend 1  
   
   
   
   
Project #DEV0014

Provide Modular Space and Security Cage in B-148, Bay F, MCASCP NC

Thurs., July 29, 2010

1:00 PM
Aaron Simpson
910-353-3797
 
 
 

www.militaryandfederal.com

 
   

Time of Completion 90 Days



Please check
www.militaryandfederal.com
for Amendments

Project #09-0083

Repair Concrete Aprons, AFS2, AFS3, and Mats 1-7, MCBCL, NC

Paving MACC

Re-Bidding
Thurs., Aug. 5, 2010

2:00 PM
Ryan Weaver
 
Specifications
Drawings
 
 
   

Time of Completion720 Days

Amend 1 Amend 7
Amend 2 Amend 8
Amend 3 Amend 8 Dwgs
Amend 4 Amend 9
Amend 5 Amend 10
Amend 6 Amend 11
SOW #0027

Structural Repairs at Transportation Command (TC) Dock, NWS Charleston, SC

SC & GA MACC

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
1:30 PM
Thurs., Aug. 12, 2010
so that we can overnight our proposal to the owner

 Tim Barrett
Specifications
Drawings
Bid Form  
Davis Bacon Wage Rates  
 

Time of Completion 730 Days

Amend 1 Amend 5
Amend 2  
Amend 3  
Amend 4  
RFI Q & A 8/5/10  
   
   
Project No. 5484198

Grounds Improvements to Old Lanham Housing, MCAS Cherry Point, NC

 

NC Paving MACC

Wed., Aug. 18, 2010

1:00 PM

Bob Warden
   
Specifications
Drawings
 
 

Time of Completion 120 Days

   
   
   
   
Project No. 10-0200 & 10-0049

Extend Parking Lot, BB-54 & Construct Parking Lot, CHB (BB-51), MCB Camp Lejeune, NC

NC Paving MACC

Wed., Aug. 25, 2010

10:00 AM

Shawn Brown
910-353-3797
Bid Form
Specs BB51 Specs BB54
Drawings BB51 Drawings BB54
 
 

Time of Completion 120 Days

   
   
   
   
Solicitation #N40085-10-R-5334

Modification of K-Ranges, Phase II (P1136), MCBCL. NC

 

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
12:30 PM
Thurs., Aug. 26, 2010

so that we can overnight our proposal to the owner

Scot Thompson
Solicitation
Specs 1 of 6 Specs 2 of 6
Specs 3 of 6 Specs 4 of 6
Specs 5 of 6 Specs 6 of 6
Drawing Files
Civil 1 of 4 Civil 2 of 4
Civil 3 of 4 Civil 4 of 4
Architectural Structural
Mechanical
Electrical 1 of 2
Electrical 2 of 2
Time of Completion 555 Days
Amend 1 Amend 6
Amend 2 Amend 7
Amend 2 Drawings Amend 8
Amend 3  
Amend 3 Attach 1  
Amend 3 Attach 2  
Amend 4  
Amend 5  
   
Project No. 059851

Replace Runway Distance Markers Signs, MCAS Cherry Point, NC

Thurs., Aug. 26, 2010

1:00 PM

Bob Warden
   
 

www.militaryandfederal.com

 
 

Time of Completion 90 Days

   
   
   
   
   
Project No. 10-0101

Repair Protestant Chapel Bldg 16, MCB Camp Lejeune, NC

Fri., Aug. 27, 2010

11:00 AM
Changed by Amend 6

Bob Warden
   
 

www.militaryandfederal.com

 
 

Time of Completion 90 Days

   
   
   
   
   
Project No. 4936342

Driveway Pavement Repairs, B-1795, MCAS Cherry Point, NC

NC Paving MACC

Tues., Aug. 31, 2010

1:00 PM

Shawn Brown
910-353-3797
Specifications
   
   
 
 

Time of Completion 35 Days

Amend 1
   
   
   
   
Solicitation #FA4418-10-R-0025

Repair/Renovate Command Section, Warehouse Support Equipment Dep., Bldg 385, Robins AFB, GA

 

 

In order to be considered ALL Subcontractor & Suppler Quotations must be in our office by
1:30 PM
Tues., Aug. 31, 2010

so that we can overnight our proposal to the owner

Tim Barrett
Solicitation
Specifications
Davis Bacon Wage Rates
Appendix C
Drawings
 
Time of Completion 295 Days
Amend 1 No Amend 5-12
Amend 1 Drawings Amend 13
Amend 2 Amend 14
Amend 2 Drawings  
Amend 3 Not Issued  
Amend 4  
Amend 4 Drawings  
Specs 01560  
Project No. BEPW1349MI

Replace Generators and ATS at Air Traffic Control Tower Bldg 1166, Runway Vault Bldg 741, Tacan Site Bldg 606 & Aircraft Radio Receiver Site Bldg 448, MCAS Beaufort, SC

Tues., Aug. 31, 2010

2:00 PM

Scot Thompson
   
 

www.militaryandfederal.com

 
 

Time of Completion 120 Days

   
   
   
   
   
Project No.09-0082

Repave Parking Lots AS504, AS515, AS130, and AS4126, MCB Camp Lejeune, NC

NC Paving MACC

Wed., Sept. 1, 2010

12:00 PM

Shawn Brown
910-353-3797
   
Specifications

Drawings

Please execute work in the following order:
1. AS504
2. AS4126
3. AS130
4. AS515

 

Time of Completion 300 Days

   
   
   
   
   
Project No. WO5376243

Alterations to Lighting Panels, Phase II, MCAS Cherry Point, NC

Wed., Sept. 1, 2010

1:00 PM

Scot Thompson
   
 

www.militaryandfederal.com

 
 

Time of Completion 270 Days

   
   
   
   
   





Last Updated on 09/02/2010 04:31 PM